When may the USACE supervisor decide that temporary project fencing is not required?

Study for the U.S. Army Corps of Engineers Test. Study with flashcards and multiple choice questions, each question has hints and explanations. Get ready for your exam!

The decision regarding whether temporary project fencing is required is primarily contingent upon the nature and locations of the project site. This includes factors such as the proximity of the work area to public access points, potential risks to unauthorized individuals, and the sensitivity of the surrounding environment or community. If the project site is situated in an area where the potential for trespassing is low, or if the activities being conducted do not pose a safety risk to outsiders, a supervisor may determine that fencing is not necessary.

Additionally, the context of the project, including existing barriers and the overall environment, plays a crucial role. For instance, a project located in a remote area where public access is controlled or limited may not necessitate fencing. The supervisor uses their judgment based on these specific characteristics of the site rather than on broader considerations, such as project size or scheduling pressures, which do not directly relate to safety and security concerns.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy